Tesoro Corporate Headquarters, San Antonio, TX

Panel 2

Tesoro, Executive Reception Area

Panel 3

Tesoro, Conference Area

Panel 4

Tesoro, Lobby Grand Stairway

Tesoro Corporate Headquarters

Project Manager • 2008 - 2009

 

Directed due diligence, planning, construction and commissioning for the 618,000 SF, $150M Tesoro corporate headquarters designed by Gensler and the 122-acre Ridgewood Office Park, located in San Antonio, TX.

 

Additional Photos

Panel 1

Phantom of the Opera Theater, Las Vegas, NV

Phantom of the Opera Theater, Venetian Casino, Las Vegas, NV

Tenant representative, Project Manager • 2005 - 2007

 

Represented the interests of Clear Channel Entertainment during the construction of the $55M, 95,000 SF - 1,800 seat permanent theater for the Phantom of the Opera in The Venetian hotel and casino in Las Vegas, NV.  Facilitated negotiations with The Venetian resulting in $2.5M client savings.

Panel 1

Burlington Resources Reception Area

Panel 2

Burlington, Elevator Lobby

Panel 3

Burlington, CEO Office

Panel 4

Burlington, Computer Room

Burlington Resources Corporate Headquarters, Houston, TX

Project Manager • 2004

 

Managed the planning and construction of this 11 floor, 251,000 SF, $22M corporate headquarters.  Assembled project team; prepared project budget and schedule; managed bidding process and monitored construction through final completion.

 

Additional Photos

Panel 1

Cabot Oil & Gas, Board Room

Panel 2

Cabot Board Room

Panel 3

Cabot, Executive Support Area

Panel 4

Cabot, Executive Offices

Cabot Oil & Gas, Houston, TX

Project Manager • 2000

 

Represented the interests of Cabot Oil & Gas during the design and construction of their 112,000 SF corporate headquarters designed by Ken R. Harry Associates.  Realized project cost savings of 28%, ($860,000 on a final construction cost of $3,000,000).

 

Additional Photos

Panel 1

MI-Swaco Headquarters, Houston, TX

Panel 2

MI-Swaco Headquarters, Houston, TX

Panel 3

MI-Swaco Lobby / Hallway

Panel 4

MI-Swaco, Gardens

MI-LLC

Development Manager • 2002

 

Provided full development services for this $17M, 125,000 SF corporate headquarters designed by Ziegler Cooper.  Directed site due diligence; negotiated agreements with all professional consultants; managed selection of general contractor and monitored construction and commissioning of the building.

 

Additional Photos

Panel 1

Theatre for the Performing Arts, Las Vegas, NV

Panel 2

TPA Theatre, Red Screens

Panel 3

TPA Theatre, Blue Screens

Theatre for Performing Arts (TPA), Planet Hollywood Casino, Las Vegas, NV

Project Manager • 2005 - 2007

 

Coordinated consultants, design, budget, and schedule and monitored general contractor’s work for $2M custom movable screen system.  At 7,500 seats, the Theatre for the Performing Arts has served as the largest theatrical venue for live entertainment in Las Vegas for the past 30 years.  To address a lack of flexibility in the seating configuration multi-layered walls of fabric mesh partitions, decoratively lit from the front were designed.  Within a brief interval the house can be physically adapted to suit performances requiring as few as 1,800 seats.

 

Additional Photos

Panel 1

Showroom Theatre, Las Vegas, NV9

Panel 2

Showroom Theatre Stage, Las Vegas, NV

Showroom Theatre, Planet Hollywood Casino, Las Vegas, NV

Project Manager • 2005 - 2007

 

Provided comprehensive project management services for a $26M, 68,000 SF – 1,800 seat Clear Channel theater in the Planet Hollywood casino.  Designed to house Broadway-style shows for extended runs, the interior can change dramatically in appearance and performance capabilities.

 

Additional Photos

Panel 1

CEPC Church, Houston, TX

Panel 2

CEPC Church, Fellowship Hall

Panel 3

CEPC, Youth Meeting Facility

Christ Evengelical Presbyterian Church, Houston, TX

Development Manager • 2001 - 2004

 

Provided comprehensive development management services for this 70,000 SF, $13M church facility.  Prepared PAD application and worked with professional consultants to secure City approval; prepared and monitored budget, schedule and capital cash flow projections.

 

Additional Photos